Skip to content

Know every kilo in, out, processed and lost

For steel and scrap businesses where margin lives in weights, wastage and what came back from job-work.

Proposed solutions

Everything on this page describes proposed solutions and illustrative interfaces, not deployed products.

Where the time and money leak

  • Weight at purchase, at processing and at dispatch rarely match, and differences go unexplained
  • Job-work receipts are checked against a notebook
  • Wastage and scrap generated are estimated rather than recorded
  • Returns and rejections are tracked in calls and chats
  • Physical stock and book stock drift apart

How the work could run instead

  • Purchase entries

    Material received with supplier, grade, weight and rate recorded as it is weighed in.

  • Material dispatch

    Dispatches to customers or job-workers recorded with weight and vehicle details.

  • Job-work receipts

    Processed material received back is matched to what was sent, showing the balance still outstanding.

  • Weight differences

    Differences between sent, received and billed weights flagged automatically for review against agreed tolerance.

  • Wastage records

    Scrap and loss logged by lot or job, giving a measured wastage figure instead of an estimate.

  • Returns and stock reconciliation

    Returns recorded against the original entry, and physical counts compared to book stock with differences listed.

Modules a first version could include

  • Weighbridge entry
  • Purchase register
  • Dispatch register
  • Job-work ledger
  • Weight variance report
  • Wastage log
  • Returns
  • Stock reconciliation
Illustrative demo

These are proposed solutions for steel and scrap businesses. The linked interface is an illustrative demo using sample data. It is not a deployed product, and nothing here describes a live client system. Real builds are scoped around your own workflow.

Questions from this industry

Talk through your steel and scrap workflow

Tell us how things run today. We will say plainly what could be built, what it depends on and where a simpler fix is better.